Vertical man lift/mast climbing work platform
Product Descriptionconstruction platform lift description:
Mobile lift platform is versatile aerial work special equipment.The it scissor mechanical structure, make the lifting platform lifting has high stability, wide operating platform and high bearing capacity, make the work high above the range is bigger, and is suitable for many people work at the same time.It makes the work high above the more efficient, safe and more security.
Note: all mobile aerial work platform can be configured mobile work platform and ac/dc power and hand pump power
construction platform lift advantage:
Lifting mechanism were made with high strength manganese steel major form.
To prevent lifting platform overload safety device.
Have a safety protection valve to prevent hydraulic pipeline rupture.
Outage case emergency drop device.
Lifting platform power matching
Ac 380 v power provide (general configuration)
Ac 220 v power provide
Dc power DC24V
Manual hydraulic pump power manual/electric dual power
Ac and dc dual power.
Product parameters
construction platform lift parameters:
Model Numbe | Rate load (kg) |
Maximum height(mm) | Minimum heigt(mm) | table size(mm) L*W | Rise time(s) | Power (kw) |
Weight(kg) | ||||||||
SJY0.45-3 | 450 | 3000 | 850 | 1400×700 | 16 | 1.1 | 400 | ||||||||
SJY0.45-5 | 450 | 5000 | 950 | 1400*850 | 43 | 1.1 | 620 | ||||||||
SJY0.3-6 | 300 | 6000 | 950 | 1800×880 | 49 | 1.1 | 650 | ||||||||
SJY0.45-6 | 450 | 6000 | 950 | 1800×880 | 54 | 1.1 | 650 | ||||||||
SJY0.45-7.5 | 450 | 7500 | 1350 | 1800×1000 | 72 | 1.5 | 1100 | ||||||||
SJY0.3-9 | 300 | 9000 | 1500 | 1800*1000 | 75 | 1.5 | 1200 | ||||||||
SJY0.45-9 | 450 | 9000 | 1550 | 1800×1000 | 80 | 1.5 | 1260 | ||||||||
SJY0.3-11 | 300 | 11000 | 1600 | 2100×1150 | 83 | 1.5 | 1320 | ||||||||
SJY0.45-11 | 450 | 11000 | 1600 | 2100×1150 | 88 | 2.2 | 1380 | ||||||||
SJY0.3-12 | 300 | 12000 | 1750 | 2450×1350 | 85 | 2.2 | 1700 | ||||||||
SJY0.45-12 | 450 | 12000 | 1600 | 2450×1350 | 90 | 3 | 1850 | ||||||||
SJY0.3-14 | 300 | 14000 | 1800 | 2450×1350 | 98 | 3 | 2200 | ||||||||
SJY0.45-14 | 450 | 14000 | 1800 | 2450×1350 | 120 | 3 | 2500 | ||||||||
SJY0.3-16 | 300 | 16000 | 1980 | 2750*1500 | 130 | 3 | 2200 |
Safety configuration:
1.Limit switch
2.Over load protection
3.Rubber Oil pipe:double deck steer wire
4.Velocity fuse protection.
Our Certificate:
Company Information
OUR COMPANY INFORMATION
ABOUT US
Established in 2008, Suzhou Haocheng Logistics machinery is a professional manufacturer and exporter that is concerned with the design, development and production of logistics equipments . We are located in Suzhou City. Jiangsu province. China , with convenient transportation .....
OUR ADVANTAGE
We have over 48 employees, an annual sales figure that exceeds USD 8 million and are currently exporting 25% of our production worldwide. Our well-equipped facilities and excellent quality control throughout all stages of production enables us to guarantee total customer satisfaction.
OUR HONOR
As a result of our high quality products and outstanding customer service, we have gained a global sales network reaching South Korea, American ,Thailand. If you are interested in any of our products or would like to discuss a custom order, please feel free to contact us. We are looking ....
OUR CUSTOMER AND EXHIBITION:
Hao Cheng service:
1. We supply ONE-STOP-SHOP solution service for logistics equipment.
2. We supply one year warranty and continuous parts supply.
3. Company located in Suzhou,We also supply the ONE-STOP-SHOP logistics service for export business,Our nearest export port is Shanghai.
Packaging & Shipping
Model Of Packing:
Method:Pallet,Wooden Case or Nude Packing...
FAQ
FAQ:
We accept make to order,so pls tell me more detail about:
1.Max rate load(kg)
2.Max height (mm)
3.Table size (L*W)
4.Power and voltage
Contact us
aerial work platform lift can overhang operation ,can overcome some obstacles or in a point lifting for more point work .Vertical man lift/mast climbing work platform can rotate 360 degrees ,load capacity big, available to two people for working at the same time and carry some tools; mobile flexible ,transfer work place convenient ,appearance beautiful.
FDGBGDGD
aerial work platform lift are widely used in highways, boat yards shopping walls, stadiums, dock, station, marketplaces, gymnasiums and residential property, Vertical man lift/mast climbing work platform workshop,residential property, mining workshops and any other isometric maintenance operation of complex high-altitude construction and other large range homework place.
HFDJHBVFD
Mainly used to installing, repairing and cleaning high aerial equipment,power equipment, overhead pipeline and so on.aerial work platform lift is an ideal equipment for guaranteeing working safe,improving working efficiency and making aerial Vertical man lift/mast climbing work platform working, more convenient and quick.