Product Details

4 to 16M 200KG double columns hydraulic portable work platform/aluminum lift/movable platform

Place of Origin China
Brand Name aerial work platform lift
Certification ISO9001:2008 CE Certificate
Model Number aerial work platform lift
Min.Order Quantity One set 4 to 16M 200KG double columns hydraulic portable work platform/aluminum lift/movable platfor
Price [email protected]
Delivery Time Within 5 working days
Payment Terms paypal,UnionPay, Visa/MasterCard, Amex, Discover,T/T
Supply Ability 95

Product Features

1. The lifting platform has been inspected and debugged at the factory before delivery. All the technical indexes have reached the design requirements. When using, the lifting platform only needs to be connected with the power supply, and the hydraulic system and electrical system need not to be adjusted.

2. The platform should be carefully checked before use of hydraulic, electrical systems, no leakage or naked leakage before use.

3. Lifting platform in use, the four legs should be firmly supported on a solid ground (with the wheel to leave the ground shall prevail) if necessary, the use of sleepers.

4. Lifting platform empty run 1-3 times before loading operation.

5 load center of gravity should be as far as possible in the center of the table.

6.Guard railings at both ends of the movable door should be locked after the lock operation.

1, Maintenance introduction
a. Wheels, countershafts and bearings, cylinder pin and bearing, jib hinge shaft and bearing wear.
b. All parts are filled with some lubricants to extend the service life of bearings.
c. Hydraulic oil and oil level. Lifting platform throughout the rise, in this position, the hydraulic floor should be higher than the bottom 40 to 50 mm. If it is found that the hydraulic oil is dark, sticky or gravel and other foreign objects should be promptly replaced (winter replacement 32 # hydraulic oil, summer 46 # hydraulic oil. In particularly cold northeast, should be replaced transformer hydraulic oil).

2, Mid-year inspection
a, According to the order of six months or 500 hours prioritized.
b, The whole platform will rise and fall, into a brace.

1.Loading capacity----200KG, 250KG OR 300KG......?

2. The size of the table-----?

3. Working height------3m, 6m, 10m, 12m......?

4. Driving mode ----Diesel engine or Hydraulic or Electric or Battery ?

5.Fixed type (without wheel) or Trolley (with wheel) ?

aerial work platform lift can overhang operation ,can overcome some obstacles or in a point lifting for more point work .4 to 16M 200KG double columns hydraulic portable work platform/aluminum lift/movable platform can rotate 360 degrees ,load capacity big, available to two people for working at the same time and carry some tools; mobile flexible ,transfer work place convenient ,appearance beautiful.
FDGBGDGD
aerial work platform lift are widely used in highways, boat yards shopping walls, stadiums, dock, station, marketplaces, gymnasiums and residential property, 4 to 16M 200KG double columns hydraulic portable work platform/aluminum lift/movable platform workshop,residential property, mining workshops and any other isometric maintenance operation of complex high-altitude construction and other large range homework place.
HFDJHBVFD
Mainly used to installing, repairing and cleaning high aerial equipment,power equipment, overhead pipeline and so on.aerial work platform lift is an ideal equipment for guaranteeing working safe,improving working efficiency and making aerial 4 to 16M 200KG double columns hydraulic portable work platform/aluminum lift/movable platform working, more convenient and quick.

All Products Contact Now