Product Details

indoor electric vertical man lift hydraulic double mast lift

Place of Origin China
Brand Name aerial work platform lift
Certification CE Certificate
Model Number aerial work platform lift
Min.Order Quantity One set indoor electric vertical man lift hydraulic double mast lift
Price [email protected]
Delivery Time Within 5 working days
Payment Terms paypal,UnionPay, Visa/MasterCard, Amex, Discover,T/T
Supply Ability 158

Product Features

indoor electric vertical man lift hydraulic double mast lift

1. aluminum ladder basic specification

Max Height

13.7m

Weight

640kg

Type

Set Of Cylinder Type Lifts

Power Source

Electric

Rated Load

200kg

Lift Mechanism

Lift Chain

Material

Aluminium Alloy

Lift Drive

Hydraulic

Bed Dimension

1.5*0.6m

Power

1.5kw

2. aluminum ladder detail description


Double Mast Aluminum Aerial Work Platforms are used for one or two person aerial working,

which made up of high grade aluminum profile in double mast structure and equipped with the

universal wheels, easily pushed around to the designated sites, beautiful structure, compact main body,

light weighted, safe and reliable; It is operated by the telescopic cylinder which is strong and reliable

working and the control panels are available on the lift platforms and ground. The platform is equipped with the ladder.

It is mainly used for the installation and maintenance of the narrow spaces such as star hotels, modern workshops,

business hall, hotels, lobby, restaurant, railway stations, exhibition hall and shopping malls; it is a good helper for

the equipment maintenance, paint decoration; Easily going through the regular doors and elevators, of low energy

consumption, no pollution, do no damage to the grounds. The lifting height ranges from 6m to 12m and lifting capacity

is 200kg.The power sources could be 220V, 380V or chargeable battery.

Main character of aluminum ladder

1. Most rigid aluminum alloy profile
2. Auxiliary platform lowering
3. Multiple-guide pulley on mast
4. Durable base system
5. Chassis with level gauge
6. DC working power on the platform
7. Easily rolls through a narrow space
8. Emergency stop button
9. Over- load protection
10. Built-in pressure release valve
11. Dual activated up/down switch
12. Locking Key Switch
13. Optional extended platform
14. Entry ladder


3.Additional information of aluminum ladder

Payment Terms

L/C, T/T

Minimum Order

1STE

Lead Time / Delivery Time

45 Day(s)

Sample Available

NO

Delivery Details

packing with pallet in PVC FILM

FOB Port

Qingdao

Packing Info

loading quantity in 20GPloading quantity in 40GP

Target Market(s)

North America, Oceania, Southeast Asia, Eastern Europe,

Africa, Hong Kong/ Macao/ Taiwan, Latin America,

Japan & Korea, Middle East & South Asia, Mainland China,

Western & Southern Europe, Northern Europe,

Central & Southern Asia, Middle East

4.Double mast double-mast lift type

Type

net height M

working height M

load capacity KG

platform size MM

overall demension MM

weight KG

power KW

Double masts

HTLH6-200-2

6

7.7

200

1190*540

1450*890*1980

420

1.5

HTLH7-200-2

7

8.7

200

1190*540

1450*890*1980

480

1.5

HTLH8-200-2

8

9.7

200

1200*600

1450*890*1980

520

1.5

HTLH10-200-2

10

11.7

200

1400*600

1550*890*1980

550

1.5

HTLH12-200-2

12

13.7

200

1500*600

1700*920*1980

640

1.5

HTLH14-200-2

14

15.7

200

1550*600

1750*950*2300

720

1.5


contact us

aerial work platform lift can overhang operation ,can overcome some obstacles or in a point lifting for more point work .indoor electric vertical man lift hydraulic double mast lift can rotate 360 degrees ,load capacity big, available to two people for working at the same time and carry some tools; mobile flexible ,transfer work place convenient ,appearance beautiful.
FDGBGDGD
aerial work platform lift are widely used in highways, boat yards shopping walls, stadiums, dock, station, marketplaces, gymnasiums and residential property, indoor electric vertical man lift hydraulic double mast lift workshop,residential property, mining workshops and any other isometric maintenance operation of complex high-altitude construction and other large range homework place.
HFDJHBVFD
Mainly used to installing, repairing and cleaning high aerial equipment,power equipment, overhead pipeline and so on.aerial work platform lift is an ideal equipment for guaranteeing working safe,improving working efficiency and making aerial indoor electric vertical man lift hydraulic double mast lift working, more convenient and quick.

All Products Contact Now