Hydraulic single aluminum lift
Product DescriptionTrue Win mobile hydraulic aluminum man lift platform uses the high strength aluminum alloy materials,
with beautiful shape, small volume, light weight, lifting balance, the advantages of safe
and reliable, the platform of their own insurance rope wear and safety protection device,
and can up and down operation, widely used in factories, hotels, restaurants, stations,
theaters, exhibition halls and other airport place.
Features:
Dual operation system: on the working platform and the base.
High strength aluminium material:
Level adjustment before lift working:
Height limit switch for man lift:
Dual chain gearing make your work more safe and stable
Stabilizer for precise leveling
Packing of Aluminum lift :
Specifications:
Model |
PL6-1 |
PL8-1 |
PL10-1 |
|||
Max. Platform Height |
mm |
6000 |
8000 |
10000 |
||
Max. Machine Height |
7350 |
9460 |
11300 |
|||
Min. Platform Height |
580 |
|||||
Ground Clearance |
60 |
|||||
Lift Rated Capacity |
kg |
150 |
125 |
|||
Platform Size |
mm |
630*650 |
||||
Outspread Size |
2030*1840 |
|||||
Electrical Source |
AC |
v |
220-240 |
|||
DC |
12 |
|||||
Aneroid Battery |
v/Ah |
2*12/75 |
||||
Charger |
v/A |
12/15 |
||||
Lifting Motor |
AC |
v/kw |
220/0.75-1.5 |
|||
DC |
12/2.5 |
|||||
Overall Length |
mm |
1420 |
||||
Overall Width |
840 |
|||||
Overall Height |
1920 |
2980 |
||||
Overall |
AC |
kg |
410 |
450 |
490 |
|
DC |
450 |
480 |
525 |
Similar products:
Team&clients:
Certification&Trade Assurance:
FAQ
FAQ:
Delivery Time? (From 1 week to 1 month after we receive the order)
Payments? (T/T and L/C, other kinds, pls contact with us)
MOQ? (1 set)
Trade term? (FOB/CIF to your nearest seaport)
Application field? (Construction, shipyard, industrial, airport, municipal garden or others)
Maintenance ScheduleA. Daily or refueling: Check the parts are good or bad Check hydraulic oil level and colour
B. Every 250hours or 3months: Change lubricating oil Check cylinders
C. Every 500hours or 6 months: Check tubes, pipes and value
D. Every 1000 hours or 1 year: Change hydraulic oil Grease rotation bearing and wear pads
E. Every 2000 hours or 2 years:Check hydraulic tank, lid and vent
F. Note: Maintain the chassis according to the Chassis’ Service manual
aerial work platform lift can overhang operation ,can overcome some obstacles or in a point lifting for more point work .Single Mast Lifting Platform / Lift Table / Aerial Work lifting Platfo... can rotate 360 degrees ,load capacity big, available to two people for working at the same time and carry some tools; mobile flexible ,transfer work place convenient ,appearance beautiful.
FDGBGDGD
aerial work platform lift are widely used in highways, boat yards shopping walls, stadiums, dock, station, marketplaces, gymnasiums and residential property, Single Mast Lifting Platform / Lift Table / Aerial Work lifting Platfo... workshop,residential property, mining workshops and any other isometric maintenance operation of complex high-altitude construction and other large range homework place.
HFDJHBVFD
Mainly used to installing, repairing and cleaning high aerial equipment,power equipment, overhead pipeline and so on.aerial work platform lift is an ideal equipment for guaranteeing working safe,improving working efficiency and making aerial Single Mast Lifting Platform / Lift Table / Aerial Work lifting Platfo... working, more convenient and quick.